Lynx FBO

Lynx FBO Proposed Fixed-Base Operator (FBO) at Fort Lauderdale Executive Airport. SIZE: 8,558 SF CONSTRUCTION COST: $3,678,668 (Approx $3.7MM)

OPF Embassair FBO

OPF Embassair FBO New Fixed-Base Operator (FBO) at Miami-Opa Locka Airport with associated aircraft hangers and VIP-style lounges. SIZE: 83,759 SF

Port of Miami Terminal G

Port of Miami Terminal G New construction of a two-story cruise terminal in Port of Miami with an adjacent parking garage. Scope includes redesign of the existing road layout and circulation adjacent to Terminal G and Terminal F. SIZE: 766,514 SF (Terminal & Garage) CONSTRUCTION COST: $294,312,449.21 COMPLETION DATE: Ongoing

Terminal 2 @ Fort Lauderdale Hollywood International Airport

Photo by Gresham Smith Terminal 2 @ Fort Lauderdale Hollywood International Airport Expansion and renovation of the existing Terminal 2 at FLL as well as two new pedestrian bridges that will connect T2 to both T1 and T3. Scope also includes modifications to airside Civil and apron markings. SIZE: 135,207 […]

Terminal 5 @ Fort Lauderdale Hollywood International Airport

Terminal 5 @ Fort Lauderdale Hollywood International Airport A new 5-Gate, two-story airline terminal at Fort Lauderdale/Hollywood Intl Airport (FLL) with a Connector Bridge to T4, as well as a Pedestrian Bridge to Cypress Garage. Additional scope includes a new Ground Transportation Area (GTA) adjacent to the Connector Bridge for […]

Port Everglades T4

Renovation of the existing Terminal 4 at Port Everglades which includes new Finishes, MEPFP and FF&E. Project also includes a new glass tower feature. Marine improvements, such as new Bitt and MT Bollards as well as Fenders are included in Scope. CONSTRUCTION COST: $26,292,566.40 SIZE: 81,932 SF building, 325,040 SF […]

Royal Caribbean Terminal 3- Port of Galveston

New cruise terminal for Royal Caribbean in Galveston, Texas at their Terminal 3 location. Project includes waiting areas for guests, a VIP lounge, security checkpoints along with a CBP area for holding and interviewing as well as a break room with offices. Sitework includes all new utilities with an underground […]

Disney Cruise Line Terminal 10 – Port of Miami

A new cruise terminal at the Port of Miami, featuring two separate terminal buildings with a connecting road. This project also includes 7 story vertical garage. The two-terminal building layout allows for ease of embarking and disembarking for passengers. Temporary sleeping quarters is also provided for cruise pilots, and VIP […]