The Bosch Group

FIU Bridge

New Pedestrian Bridge at FIU utilizing a cable-suspension system. Features include a Bemo Standing Seam Roofing system along with Aluminum Composite Metal (ACM) Ceiling / Soffit Panels as well as two elevator towers.

SIZE: 11,240 SF

CONSTRUCTION COST: $15M

COMPLETION DATE: Last Estimate completed 1/30/2022 

CLIENT:  BCC Engineering