The Bosch Group

City of Miami Fire Stations

Renovation of Existing Fire Stations #2, #9 and #12. Project includes replacing exterior openings (doors, windows, louvers) with hurricane impact-rated openings. Air handler units are to be replaced along with relevant electrical panels. Scope of Work also includes replacing the existing roofing with a new Standing Seam roof system. Fire Stations #12 includes scope for replacement of the Four-Fold Doors with Hurricane-Rated Doors.

CONSTRUCTION COST: $4,960,716.47

SIZE:

FS#2 – 10,665 SF

FS#9 – 11,735 SF

FS#12 – 11,356 SF

CLIENT: City of Miami